Municipal Fresh Water

Project Type: Municipal Fresh Water – Civil Engineering
Customer: Al Samawa City – Iraq
Product & Services: Fresh Water Pipe Supply and Installation

Project Highlights:

  • Supplying and installing of pipes and fittings; 10 bar ductile Iron Pipe, 250 mm diameter, minimum coverage 900mm.
  • Construction of concrete thrust blocks of sufficient size for the working pressure of the pipe, and imposed at all bends, tees and dead ends.
  • Repairing damaged parts of the existing (I-Section) steel piles (8 inch by 9 m long) which supports the pipelines to cross the channel Valve Chamber containing 250 mm valve; and connecting all new pipelines to the existing network so that there are no dead ends within the immediate project area, pressure test, sterilize, and commission the new pipeline.
  • Pipes and fittings were manufactured in China on behalf of JICORE.
  • Project was implemented by JICORE’s engineering team in Iraq.